StormDrop
Dashboard
Season Intelligence Report

Park City Mountain

UT · 10,026 ft summit · SLC

Grade Pending

NWS Bias

2025–26 Season Snapshot

Storms This Season

1

storm tracked

Season Snowfall

0"

season total

Best Storm

7/100

Tracked

Current Snowpack

4"

Thaynes Canyon + Parleys Summit (existing)

Avg Daily Rate

0.2"/day

storms with data

Season SWE

0.8"

snow water equivalent

NWS Forecast Accuracy

Pending

Accuracy grade pending, and it stays that way on purpose. We show the raw NWS forecast for Park City Mountain and do not grade or correct it. Six winters of NWS-against-SNOTEL checking found forecast accuracy here turns on an unresolved snow-measurement question (settled snow depth vs. fresh snowfall), not a fixed per-mountain bias anyone can honestly correct. So we show the number NWS publishes and tell you that is what it is.

SNOTEL ground truth (Thaynes Canyon + Parleys Summit (existing))

Storm History — 2025–26 Season

Level 1 · Tracked

Nov 4 – Nov 4

7
score

NWS Forecast

0.2"

Actual (SNOTEL)

Pending

Density: Dense

Rate: 0.2"/day

Full storm detail →

Local Knowledge

TGR Community Intel

Storm Day Strategy

SE flow storms favor Park City Mountain with significantly more snowfall than Cottonwoods (10+ inches more documented); historically receives more snow than Alta/LCC during SE flow events

Terrain Opening Patterns

Yellow Bear

Opens: Early season

Popular beginner/intermediate terrain that opens early in season

High T/Greeley

Opens: Early season

Intermediate terrain accessible early season

Full local intelligence for Park City Mountain

$500/year · 7-day free trial — cancel anytime

Based on 27 community reports · 2023-10-29 → 2026-01-16

Road & Access

Parleys Canyon / I-80

Restricted

Road: Dry | Notices (check timing): **TRAFFIC ALERT** The following ramps will be closed Monday, October 26, at 9 p.m. through Tuesday, October 27 at 6 a.m: Eastbound I-80 to Southbound I-215, Eastbound I-80 to Northbound I-215, Westbound I-80 to Southbound I-215, Westbound I-80 to Northbound I-215, Redwood Road to Southbound I-215 **TRAFFIC ALERT** The following ramps will be closed Tuesday, October 27, at 9 p.m. through Wednesday, October 28 at 6 a.m.: Southbound I-215 to Westbound I-80, Northbound I-215 to Redwood Road, Northbound I-215 to Eastbound I-80, Northbound I-215 to Westbound I-80, Eastbound I-80 to Redwood Road **TRAFFIC ALERT** As early as Monday, October 26 at 2 a.m. through 6 a.m., drivers can expect lane shifts on Indiana Avenue near I-215 **TRAFFIC ALERT** As early as Thursday, October 29 at 2 a.m. through 6 a.m., drivers can expect lane shifts on Indiana Avenue near I-215 **TRAFFIC ALERT** As early as 9 p.m. through 4 a.m., there will be nightly lane reductions on California Avenue from Redwood Road to South Pioneer Road for approximately 30 days. Drivers can expect one lane to remain open in each direction **TRAFFIC ALERT** The ramp from I-80 Eastbound to Redwood Road is closed and is expected to open as early as Tuesday, October 27 in the early morning hours **TRAFFIC ALERT** The ramp from I-215 Northbound to Redwood Road is closed and is expected to open as early as Tuesday, October 27 in the early morning hours **TRAFFIC ALERT** The ramp from Redwood Road to northbound I-215 is closed through July 2027 Project Background: The Utah Department of Transportation (UDOT) is reconstructing I-215 West from SR-201 to North Temple. Project elements include: rehabilitating 30 bridges and repaving 25 miles of I-215. | **TRAFFIC ALERT** The following ramps will be closed Monday, October 26, at 9 p.m. through Tuesday, October 27 at 6 a.m: Eastbound I-80 to Southbound I-215, Eastbound I-80 to Northbound I-215, Westbound I-80 to Southbound I-215, Westbound I-80 to Northbound I-215, Redwood Road to Southbound I-215 **TRAFFIC ALERT** The following ramps will be closed Tuesday, October 27, at 9 p.m. through Wednesday, October 28 at 6 a.m.: Southbound I-215 to Westbound I-80, Northbound I-215 to Redwood Road, Northbound I-215 to Eastbound I-80, Northbound I-215 to Westbound I-80, Eastbound I-80 to Redwood Road **TRAFFIC ALERT** As early as Monday, October 26 at 2 a.m. through 6 a.m., drivers can expect lane shifts on Indiana Avenue near I-215 **TRAFFIC ALERT** As early as Thursday, October 29 at 2 a.m. through 6 a.m., drivers can expect lane shifts on Indiana Avenue near I-215 **TRAFFIC ALERT** As early as 9 p.m. through 4 a.m., there will be nightly lane reductions on California Avenue from Redwood Road to South Pioneer Road for approximately 30 days. Drivers can expect one lane to remain open in each direction **TRAFFIC ALERT** The ramp from I-80 Eastbound to Redwood Road is closed and is expected to open as early as Tuesday, October 27 in the early morning hours **TRAFFIC ALERT** The ramp from I-215 Northbound to Redwood Road is closed and is expected to open as early as Tuesday, October 27 in the early morning hours **TRAFFIC ALERT** The ramp from Redwood Road to northbound I-215 is closed through July 2027 Project Background: The Utah Department of Transportation (UDOT) is reconstructing I-215 West from SR-201 to North Temple. Project elements include: rehabilitating 30 bridges and repaving 25 miles of I-215. | Intermittent closures for I-215 Reconstruct Project | Intermittent closures for I-215 Reconstruct Project contact: 855-215-8368 i215westimproved@utah.gov https://udotinput.utah.gov/i215westimproved | UDOT is replacing two bridges on I-80 at the Jeremy Ranch interchange in Summit County. What to Expect: Lane closures on Homestead Road Day work Monday through Friday from 7 a.m. to 5 p.m. with night work as needed Homestead Trail shifted to the road Trucks entering and exiting the work zone Increased noise, dust, and vibration in the project area Project Contact Information: 435-731-9296, i80jeremyranch@utah.gov, udotinput.utah.gov/i80jeremyranch

I-80 / SR-224 (Park City)

Restricted

Road: Dry | Notices (check timing): High Valley Transit SR-224 (The Bobsled Express) is a bus rapid transit construction project that spans seven-miles from Kimball Junction to Park City Old Town. The project will include segments of dedicated bus lanes as well as new stations along the corridor. Construction got underway in 2026 and is scheduled to be complete summer 2028. 2026 work includes utility upgrades, median removal and replacements, roadway widening and station construction. During construction, travelers can expect periodic lane shifts, shoulder closures, and changing traffic patterns. The project will maintain two-lanes of travel in each direction whenever possible. Work will be paused over the winter months. | Pavement preservation project

Full intelligence for Park City Mountain and 75 other resorts

Real-time storm alerts · Raw NWS forecasts · Local knowledge · Trip logistics

Start 7-Day Free Trial — $500/year

Cancel anytime · No commitment required